Maxirib™ Installation Information

Fixing Information

Special points to note

Coverage Details
Joining Method Cover (mm) Mass (kg/m 2 ) Yield m 2 tonne
Overlapping flute 850 3.9 256
Edge lapped 900 3.7 271
Butt joined 915 3.6 276

Maxirib Fixing and Laying Directions - Non-Cyclonic Areas

Note: The following recommendations apply to non-cyclonic areas.

Maxirib Fixing and Laying Directions - Non-Cyclonic Areas
Fixing to Steel
Self drilling and
tapping or wafer head*
screw with neoprene washer
Fixing to Timber
Type 17 hex
head screw
with neoprene washer
Laying Procedure
* Wafer head without neoprene washer will not provide waterproofing